Case Studies

Case Studies

case
Satisfied Clients from previous activities include:

Fabrication

Aker Solutions

Apache Energy Limited

Woodside Energy Limited

Transfield Worley Woodside Alliance

Red Rock Oilfield Services

CAPS Australia

Airpac Bukom

Pressure Dynamics

Farley Riggs

Hismelt Operations

International Power Mitsui

CSBP - Kwinana Works

Saipem Leighton Consortium

Leighton Contractors

Rotable Items

CSBP Limited

Nufarm Limited

Labour Hire

Transfield Worley Woodside Alliance

John Holland SMP

Alstom Power Limited

Worley Parsons

Shutdowns and Outages

International Power Kwinana

NewGen Power Plant

CSBP Limited

GE Power Services

Projects

Bluewaters Power Station

Collie ‘A’ Power Station

New-Gen Power

HiSmelt Corporation

Gorgon Jetty Substructure

Gorgon Underground Utilities Piping

References can be supplied from our client base if requested please contact our Administration Officer if more information is required.

Fabrication of Air Rings

Overview: Thistle Fabrication Pty Ltd were successful in winning a rigorous tender process to manufacture the air rings for our client Scope of Work: Supply of all materials (A106 GrB, 800H, 321H and 304H) including induction bends, fabrication & welding

Read More

AMC Henderson – Gorgon Jetty Caisson Works

Overview: Thistle Fabrication Pty Ltd were successful in winning the tender process with Saipem Leighton JV in provide fabrication, welding personnel and associated equipment with stores to aid the Gorgon Jetty caisson works including the sea-fastening works as required for

Read More

Fabrication of Super Duplex (UNS32760) Stainless Steel Spooling

Overview: Thistle Fabrication Pty Ltd were successful in winning a rigorous tender process with the northern waters FPSO owner operator for produced water lines fabrication and supplementing their crew with our labour and equipment for the installation Scope of Work:

Read More